Annual Report



 


 


 

City Centre Parkade Renovations 2006

From May until September 2006 there will be ongoing construction at this parkade.

Traffic deck coating will be applied to Levels 3A through 5A and to the center stairwells beginning in May. The coating will extend the life of the concrete and provide increased traction for both pedestrians and vehicles.

Prior to applying the traffic deck coating, repairs will be made to the expansion joints on the level. These joints allow the concrete slabs to flex and assist in distributing the weight load of traffic evenly throughout the level. It is critical to maintain the expansion joints to extend the life of the parkade.

Once the repairs and coating are complete, line painting will start.

Please obey construction signs and watch for equipment in the parkade.

If you have a question that isn’t answered here, please email shelley.trigg@calgaryparking.com

 

 




CPA Logo
Smart PayParking PointersParking PointersSearch



Public Parking    Residential Permits    About Us    Parking Offences    Contact Us    Impound Lot    Vehicle Auction
Privacy Policy       Smart Pay       Parking Pointers        Search       WebMaster